Colman Dock
Image Credit: Masaru Haruyama
Colman Dock is the primary ferry dock for Washington State. The projects include the Entry Building and the Elevated Pedestrian Connector where DCW is developed a comparative cost estimate to reconcile with the contractor. DCW also reviewed multiple change orders including dry systems, electrical, mechanical and structural elements, in-water infrastructure work, a complete temporary pedestrian bridge, and roadway modifications.
Project: Colman Dock
Client: WPS USA
Category: Transportation, Utilities
Location: Seattle, WA
Services: Comparative Cost Estimation, Change Order Review